Site + foundation
Survey, clearing, grading, drainage, excavation, utilities, foundation and conditions below grade.
Start with the Census 2025 contractor-built benchmark. Then separate the house, site, soft costs, local context and reserve—before a single total hides what is missing.
Start with the Census contractor-built benchmark, then expose locality, finish, complexity and the costs the contract may leave out.
Typical planning total $401,420 · $201/sq ft · $2,160/m² including entered additions and reserve.
Benchmark: 2025 Census average contract price of $198.33/sq ft for contractor-built single-family houses started. Census says the contract price excludes the improved lot. This planning model is not a builder bid, appraisal, loan decision or promise of final cost.
Use the benchmark as a starting point, then verify every phase against drawings and equal-scope bids.
Survey, clearing, grading, drainage, excavation, utilities, foundation and conditions below grade.
Framing, roof, exterior walls, windows and exterior doors that create a weather-tight shell.
Mechanical, electrical, plumbing, insulation, air sealing, drywall and required inspections.
Cabinetry, surfaces, fixtures, flooring, paint, testing, corrections and occupancy documentation.
The core calculation multiplies conditioned square feet by the Census 2025 average contract price per square foot, the selected state installation factor, finish factor and complexity factor. It then adds only the separate amounts you enter and a visible contingency.
The low and high results place a ±15% band around modeled hard construction. That band is a HomeCostGrid planning assumption, not a Census confidence interval or prediction.
Updated October 16, 2026. The source period remains 2025; this is not an observed 2026 city-price survey.
The state selection is a broad installation-factor scenario, not a measured new-build price for your city. Verify soil, flood exposure, site access, utility capacity and the permitting jurisdiction before using a local budget.
The benchmark covers contractor-built single-family homes. Do not apply it unchanged to apartments, manufactured homes, modular packages or owner-builder projects. Match delivery method, conditioned area, garage and basement scope before comparing proposals.
The phase allocations in the calculator are planning assumptions, not measured material or labor shares. Ask each builder for quantities, specifications, allowances, labor scope, subcontractor inclusions, escalation terms and overhead so cheaper finishes are not mistaken for cheaper construction.
Request a written local fee schedule and check plan review, impact fees, utility taps and inspections. Enter only amounts outside the construction contract. Land, financing and carrying costs need a separate budget; zero entered fees means unknown, not free.
Use the Permit Checker to identify what needs local verification, then use the Contractor Bid Leveler to reconcile exclusions. For renovation rather than a new house, start with the project cost library; compare project scenarios in the Comparison Center. City living costs and state comparisons answer a different question from construction bids.
For metric plans, the calculator converts area without changing the budget: 1 ft² = 0.09290304 m². Divide USD/ft² by 0.09290304 to obtain USD/m²; keep conditioned area separate from garages and unconditioned space.
The 2025 U.S. Census table reports a $171.57 median and $198.33 average contract price per square foot for new contractor-built single-family houses started. Census excludes the value of the improved lot. Your design, site and contract can differ materially.
No. Land is excluded. Enter site work, design, permits and utility connections only when they are outside the base construction contract, and avoid double-counting an included line.
Before drawings, soil information, bids and local fees exist, one exact number creates false confidence. The range keeps ordinary scope uncertainty visible while preserving your entered costs.
No. It is a planning model for comparing scope and preparing questions. Only address-specific plans, investigations, written bids and official fee information can support a project budget.