Why District of Columbia can move the budget
Both heating and cooling loads matter, and shoulder-season scheduling may create more contractor flexibility. Heating balance point, cold-weather capacity and backup heat can matter more than the old equipment nameplate.
- Labor factor
- 1.22
- Material factor
- 1.10
- Permit factor
- 1.07
- Planning index
- 122
