Why Chapel Hill, NC can move the budget
Both heating and cooling loads matter, and shoulder-season scheduling may create more contractor flexibility. Local labor, cabinet lead times, electrical and plumbing scope, permit rules and the condition behind walls usually separate an easy refresh from a major remodel.
- Labor factor
- 0.91
- Material factor
- 0.96
- Permit factor
- 0.97
- Planning index
- 91
